您好!欢迎来访东营市兴达土方工程有限公司!关于我们 | 联系我们 | 在线留言
全国统一服务热线
18678687777(来经理)
联系我们
联系人:王经理
联系电话:18678687777
地址:山东省东营市广饶县
新闻中心

挖掘机加长臂能运用在拆楼领域中

日期:2022-06-20   来源:http://www.dybocheng.com
挖掘机是我们平日里都有较多机会见到的一类工程建筑所用的机械设备,对于挖掘机加长臂来说,在其用于拆楼时是如何进行施工的?下面就来为您介绍一番。
Excavator is a kind of mechanical equipment used in engineering and construction that we have more opportunities to see on weekdays. How is the excavator lengthening arm constructed when it is used for building demolition? Now let's introduce it to you.
加长臂挖掘机利用超长型动臂和超长型斗杆,可在疏浚、护岸、坡面以及地铁建设等受地面环境限制的工况下发挥巨大的威力。当前全国各地纷纷上马地铁建设,为保护环境而进行的河道疏浚治污等工程也是遍地开花,因此加长臂挖掘机的市场需求很大。
Using the super long boom and super long bucket, the extended boom excavator can exert great power under the conditions limited by the ground environment, such as dredging, revetment, slope and subway construction. At present, subway construction has been launched all over the country, and river dredging and pollution control projects to protect the environment are also blooming everywhere. Therefore, there is a great market demand for lengthening arm excavators.
加长臂挖掘机有两段式挖掘机加长臂和三段式挖掘机加长臂,两段式挖掘机加长臂主要适用于土石方基础和深堑挖掘作业,河道清淤;三段式挖掘机加长臂主要适用于高层建筑的拆卸等工程。根据杠杆原理和力学原理,挖掘机加长臂的受力比原来减少,应该尽量不要去重作业的场合施工。
The lengthening arm excavator has two-stage excavator lengthening arm and three-stage excavator lengthening arm. The two-stage excavator lengthening arm is mainly applicable to earthwork foundation, deep cutting excavation and river dredging; The three-stage excavator lengthening arm is mainly applicable to the demolition of high-rise buildings and other projects. According to the lever principle and mechanical principle, the force on the lengthening arm of the excavator is less than the original, and the construction should not be carried out in heavy operation.
加长臂挖掘机
挖掘机加长臂如何拆楼?主要还是看楼房高低而定,举个例子,拆5层楼房:
How to dismantle a building with an excavator lengthening arm? It mainly depends on the height of the building. For example, demolish a five story building:
1、必须先运来一些泥或工业垃圾垫底,使挖掘机升直冲击锤可以够得到楼顶。
1. Some mud or industrial waste must be transported to the bottom first, so that the excavator can reach the roof by straightening the impact hammer.
2、待挖掘机开上填充物后先使其稳定,并且留有足够的转向空间。
2. After the excavator is loaded with filler, make it stable and leave enough steering space.
3、用冲击锤垂直墙面向里打墙(距顶1米左右),把墙打开一个洞,碎料往里推,不要让它掉下来砸到自己。
3. Use the impact hammer to vertically hit the wall inward (about 1m from the top), open a hole in the wall, and push the debris inward. Don't let it fall and hit yourself.
4、加长臂挖掘机会把洞扩大,先不要动梁和柱子。把砖墙打开后就打柱子,这样上面的梁支持不住也会往里面掉,保证自己的安全。按这样的顺序从上到下,往里推进。
4. The lengthening arm excavator will enlarge the hole. Do not move the beams and columns first. Open the brick wall and hit a column, so that the beam above will fall into it if it cannot be supported, so as to ensure your own safety. In this order, from top to bottom, push in.
以上就是今天为大家分享的关于问题的相关内容,希望对大家能有所帮助,想要了解更多内容可以电话联系我们或者关注我们的网站http://www.dybocheng.com
The above is the relevant content about the problem shared for you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://www.dybocheng.com 。


【本站图片均由网站所有方提供,部分图片来源于网络,如无意中侵犯了某媒体或个人的知识产权,请来信或来电告之,本网站将立即删除。】